SMP: Sample project
1. Project opening
The following chapter contains the project opening tasks which will allow the development and support of the Sample product.
Status | csNone |
---|
2.1. SMP-0003: F1 spec
The F1 feature has to be correctly specified before starting the design process.
The specification document has to be uploaded to F1 specification, reviewed and agreed with the team before closing this task.
Status | Closed |
---|---|
Assigned to | Txinto Vaz |
2.2. SMP-0004: F1 design
The F1 feature has to be correctly designed before starting the design process.
The specification document is in F1 specification.
The design document shall be uploaded to F1 design, reviewed and agreed with the team before closing this task.
Status | Closed |
---|---|
Assigned to | Txinto Vaz |
2.3. SMP-0005: F1 implementation
The F1 feature has to be correctly implementing following the organization standards, before starting the integration process.
The specification document is in F1 specification.
The design document is in F1 design.
The implementation report shall be uploaded to F1 implementation report, reviewed and agreed with the team before closing this task.
This document shall follow the Implementation report procedure.
Status | In Progress |
---|---|
Assigned to | Txinto Vaz |
2.4. SMP-0006: F1 integration
As a consequence of the design process, the implemented parts of the F1 feature have to be integrated following the integration procedure included in the F1 design document, before starting the validation process.
The specification document is in F1 specification.
The design document is in F1 design.
The implementation report is in F1 implementation report.
The integration report shall be uploaded to F1 integration report, reviewed and agreed with the team before closing this task.
Status | New |
---|---|
Assigned to | Txinto Vaz |
2.5. SMP-0007: F1 validation
In order to finish the F1 feature development process, an artifact running F1 feature has to be validated against the validation plan for F1 included in the F1 specification.
The integration report shall contain specific information to allow the execution of the validation plan on the system under test, it can be found in the document:"F1 integration report report".
The validation report shall be uploaded to F1 validation report, reviewed and agreed with the team before closing this task.
Status | New |
---|---|
Assigned to | Txinto Vaz |